Willow Road Work Plan

May 29 to June 10, 2015

West of Waukegan Road.   The stock pile areas will be removed and construction on the southern thru-lanes will commence.

Sunset Ridge to Wagner.   The contractor will be working on the final grading, parkway plantings, curb and gutter, and sidewalks on the south side. 

Wagner to Bosworth.  Over the next two weeks the remaining south side curb work will take place along with final parkway grading, sidewalk installation, and parkway planting.    

Bridge to Happ.  The final Alice Place pavement will be installed and then the contractor will be working on the grading and sidewalk installation.

Eden’s to East Limits.  Final sidewalk, curbs, driveway and planting installations are anticipated to be completed and will occur in conjunction with other similar work along the corridor.  

 

The detailed construction work and traffic conditions can be tracked at http://northfieldwillowroad.blogspot.com/ ; through Facebook at Willow Road Construction Project; or through Twitter at @willowroadcp.   Actual start dates and activities may change due to weather or other conflicts.   #willowroadcp