Wednesday, July 29, 2015

Willow Road Work Plan

July 27 to August 6, 2015

The contractor is working on the Phase III center median and left turn lanes throughout the corridor. This includes pavement removal, curb and gutter installation, left turn pavement, permanent signage, traffic signal installation, pavement markings, and irrigation system installation. Signal work is continuing.

The signals at Waukegan Road have been activated and the ones at Three Lakes Drive are awaiting ComEd connections. The signal contractor is proceeding east along the corridor with the installation and will be working on Sunset Ridge and Wagner over the next two weeks. The permanent signals are planned to be activated once fully installed and then the contractor will remove the temporary devices. The final signal interconnect work will take place at the end of the project after all signals have been activated.

The detailed construction work and traffic conditions can be tracked at http://northfieldwillowroad.blogspot.com/ ; through Facebook at Willow Road Construction Project; or through Twitter at @willowroadcp. Actual start dates and activities may change due to weather or other conflicts. #willowroadcp

Monday, July 13, 2015

Willow Road Work Plan

July 13-24, 2015

Waukegan Road to Bridge.   The contractor is working on the Phase III center median and left turn lanes.  This includes pavement removal, curb and gutter installation, left turn pavement, permanent signage, traffic signal installation, pavement markings, and irrigation system installation.  The signal work started at Waukegan Road and is proceeding east along the corridor.  The permanent signals are planned to be activated once fully installed and then the contractor will remove the temporary devices.  The final signal interconnect work will take place at the end of the project after all signals have been activated.        

Bridge to Happ.  The traffic in this area is anticipated to be changed to a Phase III configuration on July 15th and will then match the rest of the corridor.  The contractor is in the process of staining the bridge and backfilling the area by the sidewalks.  Once the traffic has been shifted they will start the median curb and gutter installation, left turn lanes, permanent signage, traffic and lighting installations, pavement markings, and irrigation system installation

The detailed construction work and traffic conditions can be tracked at http://northfieldwillowroad.blogspot.com/ ; through Facebook at Willow Road Construction Project; or through Twitter at @willowroadcp.   Actual start dates and activities may change due to weather or other conflicts.   #willowroadcp

Tuesday, July 7, 2015

Detour Alert – Wagner Road

The Cook County Department of Transportation and Highways has announced they will be closing the north leg of the Wagner and Winnetka intersection on Thursday, July 9th to repair a collapsed storm water pipe. The duration of the closure is not yet known and will depend on the extent of the underground repairs that are needed.

The east and west bound lanes on Winnetka Avenue will remain open as will the southern leg of the Wagner Road. North bound traffic will be able to use Sunset Ridge Road, Happ Road, or Northfield Road. Updates will be posted as more detailed information is made available from the County.